Calculation of the cost of a full cycle of life in the city of Rostov-on-Don
Abstract
Calculation of the cost of a full cycle of life in the city of Rostov-on-Don
Incoming article date: 07.01.2023This article discusses the relationship of all stages of the life cycle of buildings on the basis of information-analytical system IAS HCS. The full life-cycle cost of a 1,000-seat school was calculated. Using the IAS HCS program, we made calculations of the costs of repair work on three models: without taking into account any repair work, taking into account the repair of the main structural elements and taking into account the repair of all elements, based on the standard operating time. Real estate life cycle cost analysis can be performed for both new and existing buildings of any type (residential and public). Evaluation of the total costs of the full life cycle of the object can be applied by both the developer and the owner of the building to further improve the management system of the property.
Keywords: lifecycle of construction object, information modeling, social facilities, cost of repair work, replacement cost