×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Technology of high-precision installation of kinematic seismic isolation support

    The article is devoted to solving the problem of high-precision installation and alignment of kinematic supports on ball rolling bodies, a detailed description of the design solution for precise fixation of ball rolling bodies on a flat monolithic concrete foundation during installation of a seismic insulating support and describes the phased construction of all elements of kinematic seismic insulating supports in the underground part of a high-rise building.A system of seismic-insulating kinematic supports installed in the underground part of a high-rise building is considered. An improved method of high-precision installation of kinematic seismic isolation supports is proposed, which allows to increase the accuracy of installing a seismic support on a system of four rolling elements. The technology of mounting seismic supports on the zero cycle of construction of a high-rise building is described. The advantages are evaluated.

    Keywords: high-rise structure, vibration damping, roller seismic vibration compensation system, seismic insulation, high-precision installation of seismic insulating supports

  • Optimization of organizational and technological solu-tions for installation of hinged ventilated facades using the example of sports facilities

    " The article discusses organizational and technological solutions for the installation of hinged ventilated facades, which are aimed at: ensuring the efficiency of work; increasing labor safety and productivity, reducing the cost of installation work, eliminating wasteful consumption of all types of resources used, using progressive methods of organizing work; use of modern means of mechaniza-tion and automation. Organizational and technological solutions in the design of ventilated curtain walls were optimized in three stages. The main problem identified in this article is that in modern construction, with a wide variety of structures available, facade systems are selected without appropriate organizational, technologi-cal, and economic justification, mainly relying on the experience of previous construction projects. Therefore, the problem of lacking reliable tools for determining the effectiveness of various organi-zational and technological solutions for facade work production at the planning stage of the object's life cycle can be formulated."

    Keywords: hinged ventilated facades, organizational and technological solutions, organiza-tional and technological documentation, technological map, thermal insulation

  • Basics of calculating a quantitative assessment of the installation manufacturability of steel structures with a span of up to 18 m

    The relevance of the issue of variant design is considered, taking into account the analysis of previously applied solutions. The concept of installation manufacturability of objects is revealed, its component properties are substantiated. A table of the hierarchy of installation manufacturability properties has been generated. The functions of each level of the property hierarchy are disclosed. The weight indicators of the criteria were calculated using an expert survey. a formula for a complex indicator of installation manufacturability was obtained. A hypothesis has been put forward about the quantitative assessment of the levels of installation manufacturability.

    Keywords: manufacturability, installation manufacturability, levels of hierarchy of installation manufacturability, weight of indicators of properties of installation manufacturability, installation of steel structures

  • Modeling and experimental study of influence of pressure in the gas supply system of plasma installation on the flow velocity

    The article is devoted to the study of the flow rate depending on the pressure in the gas supply system of the plasma head. The problem was solved by conducting a computer experiment with subsequent verification of the results by a full-scale experiment. The laboratory plasma installation MAK-10 assembled on the basis of the IMET UB RAS, used in the processes of coating, powder production and surface modification of parts, was simulated. The computer experiment was carried out using the SolidWorks Flow Simulation software package. As a result of the work performed, the distribution of the flow rate along its axis was demonstrated during the operation of the plasma installation with a pressure in the gas supply system of 0.1; 0.2 and 0.3 MPa. Recommendations for conducting coating, powder production and surface modification processes have been developed, which have practical benefits for consumers of process equipment.

    Keywords: mathematical model, flow, velocity, pressure, plasma method, powder production, coating, surface modification

  • Development of an operational quality control scheme for installation of sheet metal waterstops

    The article presents an analysis of the requirements for quality control in the current regulatory documentation of the Russian Federation and the experience of developing a scheme of operational quality control (SOQC) for the installation of sheet metal waterstops, obtained on the basis of regulatory and methodological documentation and materials from manufacturers of waterproofing materials: domestic and foreign, and the practice of using polymer and metal waterstops and our own experimental studies. The content of the main information blocks of the SOQC in the practically accepted unification of requirements for quality control in construction is described. Construction defects are indicated when using polymer waterstops for waterproofing technological seams of monolithic structures of civil buildings, which can be avoided if the requirements are met and the work is performed in accordance with the developed SOQC as part of the technological map of the work production project.

    Keywords: scheme of operational quality control, quality in construction, installation tolerance, requirements, sheet metal waterstop

  • Assessment of manufacturability of assembly elements during the installation of a steel structure

    Methods for calculating technological and functional tolerances in the manufacture and installation of steel structures are described. An experimental installation of the structure was carried out to make it possible to clarify the tolerances, and the foundations of the methodology for assessing the qualitative and quantitative manufacturability of assembly elements were put forward to simplify the processes of manufacturing and assembling the structure.

    Keywords: methods for calculating tolerances, installation of a structure, manufacturing of structures, manufacturability, complex indicator of manufacturability

  • Issues of sufficiency of engineering and geological surveys on the part-time territory for the installation of the foundations of power floors and foundations of the logistics center

    The loads on the power floors and column foundations of modern logistics centers can reach 6-9 t/m2 and 1000 t, respectively. At the same time, the step of the grid of exploration wells in the mined areas does not allow reflecting on the geological sections the exact geometry of the occurrence of weak, untreated soils of backfilling pits. The use of a method for strengthening man-made soils by pressing in prefabricated prismatic piles made it possible to compensate for the missing information from engineering and geological surveys by controlling the forces of indentation and thus determining the occurrence marks of more durable foundation soils.

    Keywords: engineering and geological surveys, the territory being worked on, man-made soils, soil reinforcement with piles, geological section

  • Organizational and technological aspects of repair and construction work on the installation of utility pipeline networks in dense urban areas

    The article raises issues of repair and construction work on the installation of underground utility pipeline networks in urban environments. The sphere of housing and communal services today is characterized by the presence of high wear and tear of communal pipeline networks: sewer systems, water supply systems, energy systems, etc., which requires urgent measures to solve this problem as part of the implementation of urban reconstruction projects.

    Keywords: repair and construction work, municipal pipeline networks, urban services, utilities, housing and communal services

  • The use of the "Quality Index" in the assessment of construction and installation works

    The problem of quality in construction and installation works at intermediate stages is being discussed. The role of technical supervision in the construction process is outlined. A proposed indicator, the "Quality Index," is presented for consideration, which reflects not only the quality of the works but also the effectiveness of the technical supervisor's work during the construction process.

    Keywords: quality, construction quality, construction quality index, quality coefficient, regulations, technical supervisor engineer

  • Methodology for assessing overall risk of delay in completion of construction and installation work

    A more adequate methodology for assessing the overall risk of untimely completion (construction and installation works - CIW), taking into account the time horizon of risk occurrence and the phenomenon of risk competition from both probability and impact perspectives, is justified. One of the most common problems in construction projects is delays caused by risks. However, existing research on risk assessment and project schedule analysis overlooks the fact that the aggregate risk depends on the sequence of risk occurrences and their interactions. This article presents a decision algorithm and justifies a computational method for determining the risky duration of work in the project schedule. This information is crucial for making adjustments to the schedule and developing effective risk response strategies. In the calculation examples we have provided, we have demonstrated that our approach differs from the classical method.

    Keywords: "probabilistic planning, delays, aggregate risk, risk assessment, uncertainty, construction management, quantitative analysis, timelines, investment projects"

  • Determination of tension arising during the installation of polyethylene gas pipelines

    The results of research permissible longitudinal axial and fiber tensions are given for various characteristics of gas distribution and gas consumption systems.

    Keywords: polyethylene gas pipeline, longitudinal axial tension, longitudinal fiber tension, gas pipeline deformation, optimal gas pipeline bending radius

  • The use of a geothermal energy installation for heating private houses in order to develop green energy

    The article is devoted to the use of renewable energy sources, namely geothermal energy for home heating. Methods of installation, advantages and disadvantages of geothermal heating are investigated. A comparative analysis of the cost of 1 MJ of heat received from various energy sources was carried out, and the efficiency of using heat pumps for heating buildings was proved. It was noted that in connection with the global problem of greenhouse gas emissions, this decision is relevant and paramount for achieving hydrocarbon neutrality. The introduction of geothermal heating methods can be a huge step towards green energy.

    Keywords: system, temperature, geothermal heating, heat pump, compressor, evaporator, condenser, carbon footprint, ecology, green energy

  • Development of a system for automatic installation of a magnetic field sensor sensor in a neutral position

    The development of an automatic system for installing a magneto-optical magnetic field sensor in a neutral position has been carried out. Installation in the neutral position is carried out by an automatic piezoelectric drive control system based on a microcontroller. A mathematical model is constructed and numerical simulation of the automatic control system is performed. The results and parameters of the simulation are presented. The developed system provides a significant increase in the autonomy of the sensor, which makes it possible to eliminate or significantly reduce the cost of regulating the sensor.

    Keywords: magnetic field sensor, magneto-optical sensor, automatic control system, piezo motor

  • Evaluation of technological solutions for the installation of an operated roof based on effectiveness indicators

    The concept of vertical expansion of development is becoming more and more popular in Russia, especially in large cities due to the scarcity and high cost of building land. This article continues the study presented in the material on the choice of a variant of the technology for constructing an operated roof, designed to be used, for example, as a recreation area, sports grounds, landscaping, etc. The article presents the results of a comparative assessment of the technological efficiency of the operated roofs construction, arranged with a traditional and inverse arrangement of a waterproofing carpet and thermal insulation. In the study, methods for evaluating their organizational and technological solutions based on technological efficiency indicators were applied. In addition, examples the systems engineering assessment tools use is provided. Determination of the manufacturability degree for the operated roofs installation on the basis of some system-technical principles and optimality criteria when comparing different options for organizational and technological solutions. Based on the calculation of performance indicators, a set of indicators with different dimensions arises. They are used as input for aggregate analysis when applying systems engineering. This approach allows achieving internal compatibility between the elements of the system, in this case, the obtained performance indicators. The technological advantages of the inversion installation of an exploited roof, in particular, intended for landscaping, have again been confirm.

    Keywords: exploited roof, vertical gardening, inversion roof technologies

  • Estimation of the duration of laying concrete mix on the installation horizon

    The article discusses the peculiarity of determining the duration of laying concrete mix depending on the height of the installation horizon. As a result of the study, the design was justified, which was accepted as a representative object, a sample of standard values of machine time costs was performed depending on the height (number of floors) of the building, the dependence of the calculated value of machine time costs on the height of the floor (the horizon of the work) was obtained, the reliability of the calculated values was estimated.

    Keywords: monolithic construction, concrete works, labor intensity of work, duration of work, installation horizon, tower crane