The article deals with current methods of evaluating the organization and management in construction under conditions of uncertainty. The typology of the failure process is given, which determines the scenario of the crisis development at the enterprise. A model of forecasting and management in a crisis is proposed, and the conceptual aspects of building this model are considered. It is proposed to improve the enterprise management system based on the analysis of the economic component as a temporary function. Recommendations are given for improving the existing organizational forms of enterprise management.
Keywords: construction organization, organizational and technological solutions, reliability assessment, construction quality assessment
Questions of accounting of actors of influence on the investment and construction cycle are raised. An example of the use of BIM-technologies in construction is considered. It describes the solution of some specific problems that arise when maintaining the quality of construction of complex buildings, taking into account the possibility of introducing modern information systems, attention is paid to the peculiarities of improving the quality of work performed.
Keywords: organization of construction; quality of design, quality of construction and installation works, BIM-technology
The article deals with the existing problems in our country, arising in the management of material resources in the process of construction of buildings and structures. The main problem in the material resources management system is that due to their late and incomplete delivery to the construction projects, there are significant downtime of working and construction machines and mechanisms. The don state technical University (DSTU) is developing an intelligent construction management system, which includes a method of planning and accounting for the movement of material resources to ensure synchronization of the processes of construction and installation works and their complete supply. The use of this technique allows to optimize the timing and volumes of supplies of material resources in accordance with a given technology of production operations and the simultaneous control of their inventory in the onsite warehouse
Keywords: organization of construction; economy of construction, production of building materials