  • Quality problems of construction and installation works for the construction of the load-bearing frame of large-panel residential buildings of the PIK series

    The purpose of the study, which this article is limited to, is to analyze the violations committed during the installation of precast concrete goods of a residential building, the place where errors occurred and their causes, and analyze the consequences of violation of the technology for erecting the supporting frame of a residential large-panel building. To achieve this goal, it is necessary to study and analyze the main technological actions and in the process of operational quality control, to identify the places of occurrence of technology violations.On the example of a large-panel residential building, the problems of the quality of work during the construction of the aboveground part of the building are considered. The drawbacks of the constructive solution of external wall panels and joints between them are revealed. The main mistakes in the production of work are considered, at what point in the production of work they arise, and what they will lead to in the future. An example of operational construction control of the installation of load-bearing structures of a large-panel residential building is given.An analysis of errors in construction and installation works was carried out, conclusions were drawn and proposals were made to improve the quality of work during the construction of a large-panel residential building.

    Keywords: panel house building, quality of construction and installation works, PIK, construction of residential buildings, violation of technological processes, production, construction, quality control