×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Selection of performance indicators of material and technical support in housing construction

    The measures aimed at material and technical support are given, as a result of which high performance in housing construction can be achieved. The performance criterion of material and technical support during the construction and installation works is proposed in the form of a reduction in the duration of a project construction, which results in a reduction in the cost of work and resource savings. As an example, the procedure for calculating economic performance by the material and technical support factor during the construction of a large-panel two-section apartment building of variable number of storeys is shown. The calculation measures are based on reducing the necessary stocks of structures at the construction site, as well as reducing the costs associated with their acquisition and storage. It is shown that as a result of the proposed measures in the material and technical support of construction, based only on the main structural components, it is possible to obtain a noticeable economic effect due to a reduction in the dura-tion of construction and in additional costs in the conditions of the construction site.

    Keywords: construction, construction and assembly work, large-panel buildings, logistical support, material resource inventory

  • Features of the functioning of the logistics system in large-panel housing construction

    The paper discusses the principles and conditions of supplies allocation on the construction site. It covers the functional dependences of the logistic support in the course of construction of large-panel buildings. The paper presents the required conditions for the stable functioning of material supply system, making it possible to ensure a rhythmic and uninterrupted process of the facility construction. Various types of production supplies of material resources are offered at the construction site for large-panel housing construction, which is based on a sufficient volume of structures and products taking into account the possible occurrence of risks of performing the planned amount of work. It is concerned with the comparative analysis of the main ways of determining the need for material and technical resources.

    Keywords: construction, construction and assembly work, large-panel buildings, logistical support, material resource inventory