×

You are using an outdated browser Internet Explorer. It does not support some functions of the site.

Recommend that you install one of the following browsers: Firefox, Opera or Chrome.

Contacts:

+7 961 270-60-01
ivdon3@bk.ru

  • Methodology for the numerical experiment of laying headers under motorways in a closed way

    The methodology of numerical experiment of laying with closed method by methods of horizontal-directional drilling, brown-screw drilling, forcing, microtonneling has been developed. Some features of the construction of cases for penetration by collectors under existing highways, including general information about the used materials of the cases, are given. A selection of controlled factors and experiment planning, system stability check, results reliability analysis was performed.

    Keywords: collector, numerical experiment methodology, microtonneling, horizontal directional drilling, brown-screw drilling, puncture, forcing, motorway, case, reinforced concrete, metal pipes

  • Mathematical modeling of the middle part of the Karasan landslide

    The article considers the geological features of the Karasan landslide. The result of mathematical simulation of landslide motion in time is also presented.

    Keywords: landslide, landslide slope, mathematical modeling, geomechanical modeling, finite element method, Karasan landslide, anti-landslide protection

  • On Stabilization of Landslide Slope with TITAN Anchor

    The results of simulation of stabilization of landslide slope by method of finite elements are considered in the article. The slope stabilization system includes retaining reinforced concrete structures (newly erected and reconstructed) with an anchor support of the TITAN system.

    Keywords: landslide, landslide slope, landslide circus, retaining structures, anchor support, anchor, mathematical modeling, geomechanical modeling, finite element method

  • Simulation of manifold penetration under the active motorway

    The article deals with the issue of modeling by the finite element method of the penetration of the communication tunnel under the operating multi-lane highway demand microtonneling, horizontal directed drilling and construction under the protection of the screen from pipes

    Keywords: Tunnel, collector, finite element method, microtonneling, horizontal directional drilling, motorway, case, reinforced concrete, metal pipes, settling mule

  • The choice of an enclosing structure of a deep ditch in a zone of a transport tunnel at pointed building

    The modern problem of building of big cities consists that there is almost no place left for the free building. Therefore it is necessary to carry out so-called "pointed building" when construction is conducted in the constrained conditions. At the same time very often construction sites get to an area of coverage of the subway that causes particular difficulties at construction of constructions in deep ditches.

    Keywords: modeling, stress-strain, tunnel, subway, deep ditch, pointed building, ditch protection

  • On the problems of presence on the construction sites of oil-contaminated soils in the city of Moscow

    The problem of determining the environmental hazard in the development and disposal of oil contaminated soil at the time of construction of buildings and structures is very relevant, especially for sites on which previously located industrial zones with different production. Unfortunately, at the moment, there is no clear understanding of the MPC of petroleum products in the ground. Various inspection inspections and specialized landfills treat the degree of soil contamination with oil products in different ways. In this regard, there is a danger of incorrect definition of the hazard class of the soil, which can lead to subsequent pollution of the environment.

    Keywords: soil, oil product, hazard class, resolution, pdk, range, ecological condition, soil utilization, construction, concentration, pollution

  • About creation of model of calculation of jointed rock mass at tectonic loadings by method of equivalent materials

    In article results of the previous work of authors of numerical modeling of jointed rocky massifs at tectonic loadings are. Also in article the detailed description of carrying out physical modeling with use of equivalent materials is given. Results of this modeling and their comparison with numerical experiment are yielded.

    Keywords: physical modeling, numerical modeling, mathematical modeling, imitating modeling, method of final elements, the intense deformed state