Reasons for delays in the inspection of buildings and structures at the level of the organization of work

Abstract

Reasons for delays in the inspection of buildings and structures at the level of the organization of work

Efimov V.V., Shurov E.S.

Incoming article date: 15.12.2022

Carrying out work on the inspection of buildings and structures is a set of measures aimed at identifying the actual condition of the object. Since the work on the inspection of buildings includes the work of various specialists, various problems arise related to the incorrect organization of the work. This article is devoted to the identification of the main elements of deadlines, with a reserve for the further development of a tool to reduce the impact on the timing of work.

Keywords: inspection of buildings, interaction of specialists, organization of work, non-destructive methods for determining the strength of concrete, project management