Estimation of the time factor in technical systems on the example of manufacturing products of heavy and nuclear engineering
Abstract
Estimation of the time factor in technical systems on the example of manufacturing products of heavy and nuclear engineering
Incoming article date: 12.03.2020In this paper, the time of manufacturing of nuclear industry products is estimated depending on the complexity of technological operations, the time to justify the choice of manufacturing options, and the performance of mandatory research and development work . The time factor as an element of the system of technical progress is presented on the practical example of replacing heavy Metalworking equipment with mobile small -sized units.
Keywords: time factor estimation, shell, steam generator, roller stands